Arnold Palmer Regional Airport – Widen and Strengthen Runway 6/24, Phase II

Owner:  Westmoreland County Airport Authority
Value:  11.7 Million
Completion: 2020
Scope of project:  The project included three large drainage detention beds, asphalt widening & partial overlay of the runway, and new runway lights & signage.  The airport remained operational during the project except for nightly closures and a two-week closure in September for final overlay and new paint markings.

Atlantic Aviation

Owner: Atlantic Aviation
Completion: 2018
Scope of Project: Replacement of concrete pavement, inlets, trench drains, drainage pipe and pavement markings.

Deice Pad C

Project:  Deice Pad C
Owner:  Allegheny County Airport Authority
Value:  24 Million
Completion:  2018
Scope of Project:  The complete reconstruction of Deice Pad C which included excavation, trench drain construction, installation
of numerous drainage pipe/valves up to 84” diameter, and installation of over 60,000 SY of airfield concrete pavement.

Construction and Repair of a Fuel System

Project:  Construction and Repair of a Fuel System, Apron, Taxiway, Ramp, and Lighting at the Pittsburgh Air Reserve Station, PA
Owner:  US Army Corps of Engineers
Value:  18 Million
Completion:  2019
Scope of Project:  As a subcontractor, Golden Triangle will be responsible for the excavation, installation of drainage facilities, subbase, and installing over approximately 38,000 SY of pavement in accordance with USACE specifications.

 

Cargo 3 Ramp Improvements

Project:  Cargo 3 Ramp Improvements
Owner:  Allegheny County Airport Authority
Value:  6 Million
Completion:  2018
Scope of Project:  The extension of Cargo Ramp 3 to accommodate larger aircraft which included excavation, drainage improvements, detention facility installation, asphalt paving on taxiway, and concrete pavement of the cargo ramp area.

Runway ACAA 14-32

Owner: Allegheny County Aiport Authority
Value: $7 million
Scope of Project: Replacement of concrete slab and base course on re-compacted subbase of approximately 500 LF of runway and also associated taxiways. Also included full depth runway shoulder, minor grading modifications, installation of a new under drain system, and removal and reinstallation of drainage structures.