Owner: Beaver County
Value: 22 Million
Completion: 2014
Scope of Project: The project included construction of a 600’ bridge over the Beaver, a 3 span railroad bridge, and a soldier pile retaining wall. The substructure for the 600’ bridge and the soldier pile retaining wall were design build.