Steel girder erectionfor the 55C1-1 section of the PA turnpike Southern Beltway. The dual, 4-span structures consist of 72 individual steel sections which are field spliced to create the 1015’ continuous composite bridges over SR 50 and Millers Run Road. Golden Triangle is the structures subcontractor for Beaver Excavating on this section.