I-70 over PA 519

Owner: Pennsylvania Department of Transportation
Value: $26.4 Million
Scope of Project: Included the reconstruction of the existing interchange from a partial clover leaf with limited acceleration and deceleration lane lengths to a full diamond interchange. Also included replacement of a 3-span steel girder bridge and an extension of an existing concrete arch culvert. Additionally, this project included widening the existing median and added two signalized intersections at the junction of the ramps interchange. SR 519 widened to provide for left hand turning lanes on to the Eastbound and Westbound acceleration ramps. The project reconstructed approximately one mile of SR 70 (including replacing the SR 70 structure), approximately 1700 of SR 519, and included the realignment of three township roadways.